Publications icon2023 Session Laws of Kansas

CHAPTER 12

House Bill No. 2226

An Act concerning the state corporation commission; relating to the Kansas underground utility damage prevention act; extending the time period for notice for excavations; permitting virtual whitelining of excavation sites; amending K.S.A. 66-1804 and 66-1810 and K.S.A. 2022 Supp. 66-1802, 66-1805 and 66-1806 and repealing the existing sections.

Be it enacted by the Legislature of the State of Kansas:

Section 1. K.S.A. 2022 Supp. 66-1802 is hereby amended to read as follows: 66-1802. As used in this act:

(a) "Damage" means any impact or contact with an underground facility, its appurtenances or its protective coating, or any weakening of the support for the facility or protective housing which that requires repair.

(b) "Electric public utility" means the same as such term is defined in K.S.A. 66-101a, and amendments thereto.

(c) "Emergency" means any condition constituting a clear and present danger to life, health or property, or a customer service outage.

(d) "Excavation" means any operation in which earth, rock or other material below the surface is moved or otherwise displaced by any means, except tilling the soil for normal agricultural purposes, or railroad or road and ditch maintenance that does not change the existing railroad grade, road grade and/or ditch flowline, or operations related to exploration and production of crude oil or natural gas, or both.

(e) "Excavator" means any person who engages directly in excavation activities within the state of Kansas, but shall not include any occupant of a dwelling who: (1) Uses such dwelling as a primary residence; and (2) excavates on the premises of such dwelling.

(f) "Facility" means any sanitary sewer or underground line, system or structure used for transporting, gathering, storing, conveying, transmitting or distributing potable water, gas, electricity, communication, crude oil, refined or processed petroleum, petroleum products or hazardous liquids;. "Facility" shall does not include, any stormwater sewers or :

(1) Production petroleum lead lines, salt water disposal lines or injection lines, which that are not located on platted land or inside outside the corporate limits of any city; or

(2) any stormwater sewers.

(g) "Locatable facility" means facilities for which the tolerance zone can be determined by the operator using generally accepted practices such as as-built construction drawings, system maps, probes, locator devices or any other type of proven technology for locating.

(h) "Marking" means the use of stakes, paint, flags or other clearly identifiable materials to show the field location of underground facilities, in accordance with the rules and regulations promulgated by the state corporation commission in the administration and enforcement of this act.

(i) "Municipality" means any city, county, municipal corporation, public district or public authority located in whole or in part within this state which that provides firefighting, law enforcement, ambulance, emergency medical or other emergency services.

(j) "Notification center" means the statewide communication system operated by an organization which has as one of its purposes to receive and record notification of planned excavation in the state from excavators and to disseminate such notification of planned excavation to operators who are members and participants.

(k) "Operator" means any person who owns or leases an underground tier 1 or tier 2 facility, except for any person who is the owner of real property wherein is located underground facilities for the purpose of furnishing services or materials only to such person or occupants of such property.

An electric public utility shall not be considered an operator of any portion of an underground facility that is on another person's side of the point where ownership of the facility changes from the electric public utility to another person as determined by the electric public utility's rules and regulation, tariffs, service or membership agreement or other similar documents.

(l) "Preengineered project" means a public project or a project which that is approved by a public agency wherein the public agency responsible for the project, as part of its engineering and contract procedures, holds a meeting prior to the commencement of any construction work on such project in which all persons, determined by the public agency to have underground facilities located within the construction area of the project, are invited to attend and given an opportunity to verify or inform the public agency of the location of their underground facilities, if any, within the construction area and where the location of all known and underground facilities are duly located or noted on the engineering drawing as specifications for the project.

(m) "Permitted project" means a project where a permit for the work to be performed must be issued by a city, county, state or federal agency and, as a prerequisite to receiving such permit, the applicant must locate serve notice of intent of excavation to all operators of underground facilities in the area of the work and in the vicinity of the excavation and notify each owner of such underground facilities.

(n) "Person" means any individual, partnership, corporation, association, franchise holder, state, city, county or any governmental subdivision or instrumentality of a state and its employees, agents or legal representatives.

(o) "Production petroleum lead line" means an underground facility used for production, gathering or processing on the lease or unit, or for delivery of hydrocarbon gas and/or or liquids to an associated tank battery, separator or sales facility. "Production petroleum lead lines" shall include includes underground lines associated with lease fuel and saltwater disposal and injection.

(p) "Platted land" means a tract or parcel of land which that has been subdivided into lots of less than five acres for the purpose of building developments, including housing developments, and for which a surveyor's plat has been filed of record in the office of the register of deeds in the county where the land is located.

(q) "Tier 1 facility" means an underground facility used for transporting, gathering, storing, conveying, transmitting or distributing gas, electricity, communications, crude oil, refined or reprocessed petroleum, petroleum products or hazardous liquids.

(r) "Tier 2 facility" means an underground facility used for transporting, gathering, storing, conveying, transmitting or distributing potable water or sanitary sewage.

(s) "Tier 3 facility" means a water or wastewater system utility which that serves more than 20,000 customers who elects to be a tier 3 member of the notification center pursuant to this subsection. The operator of a tier 3 facility shall:

(1) Develop and operate a locate service website capable of receiving locate requests;

(2) publish and maintain a dedicated telephone number for locate services;

(3) maintain 24-hour response capability for emergency locates; and

(4) employ not less than two individuals whose primary job function shall be the location of underground utilities. Operators of tier 3 facilities shall make either such website or contact information available to the notification center. The notification center shall collect and charge a fee of $500 a year for each tier 3 facility. No other fee, charge or cost shall be assessed to a tier 3 facility by the notification center. Tier 3 members shall be subject to all provisions of K.S.A. 66-1801 et seq., and amendments thereto.

(t) "Tolerance zone" means the area not less more than 24 inches of the outside dimensions in all horizontal directions of an underground facility, except that a larger tolerance zone for a tier 1, 2 or 3 facility may be established by rules and regulations adopted under K.S.A. 66-1815, and amendments thereto. An operator of a water or wastewater facility may elect to use a tolerance zone for such water or wastewater facility in which tolerance zone means the area not less more than 60 inches of the outside dimensions in all horizontal directions of an underground water or wastewater facility upon notification of the excavator, except that a larger tolerance zone may be established by rules and regulations adopted under K.S.A. 66-1815, and amendments thereto.

(u) "Update" means an additional request from the excavator to extend the time period of the request for intent to excavate beyond the 15 20 calendar day duration of the request.

(v) "Whitelining" means the act of marking by the excavator the route or boundary of the proposed excavation site with white paint, white stakes or white flags or identifying such route or boundary by other technology developed for such purposes.

(w) "Working day" means every day Monday through Friday beginning at 12:01 a.m., except for the following officially recognized holidays: New Year's day, Memorial day, Independence day, Labor day, Thanksgiving day, the day after Thanksgiving and Christmas.

Sec. 2. K.S.A. 66-1804 is hereby amended to read as follows: 66-1804. (a) Except in the case of an emergency, an excavator shall serve notice of intent of excavation at least two full working days, but not more than 15 20 calendar days before the scheduled excavation start date, on each operator having underground tier 1 facilities located in the proposed area of excavation.

(b) An excavator may serve notice of intent of excavation at least two full working days, but not more than 15 20 calendar days before the scheduled excavation start date, on each operator of tier 2 facilities located in the proposed area of excavation.

(c) The notice of intent to excavate or any subsequent updates shall be valid for 15 20 calendar days after the excavation start date and such notice shall only describe an area in which the proposed excavation reasonably can be completed within the 15 20 calendar days.

(d) Notwithstanding the provisions of subsections (a) through (c), the state corporation commission may adjust the extent of time that a notice of intent to excavate is valid in accordance with rules and regulation adopted by the commission pursuant to K.S.A. 66-1815, and amendments thereto.

(e) No person shall make repeated requests for remarking unless the request is due to circumstances not reasonably within the control of such person.

(e)(f) The notice of intent of excavation shall contain the name, address and telephone number of the person filing the notice of intent, the name of the excavator, the date the excavation activity is to commence and the type of excavation being planned. The notice shall also contain the specific location of the excavation.

(f)(g) The person filing the notice of intent to excavate shall, at the request of the operator, whiteline the proposed excavation site when the excavation location cannot be described with sufficient detail to enable the operator to ascertain the location of the proposed excavation.

(g)(h) The provisions of this section shall not apply to a preengineered project or a permitted project, except that the excavators shall be required to give notification in accordance with this section prior to starting such project.

Sec. 3. K.S.A. 2022 Supp. 66-1805 is hereby amended to read as follows: 66-1805. (a) This act recognizes the establishment of a single notification center for the state of Kansas. Each operator who has an underground facility shall become a member of the notification center.

(b) For operators of tier 1 facilities or operators of tier 2 facilities that desire notification in the same manner as operators of tier 1 facilities, the notification center shall provide prompt notice of any proposed excavation or report of damage or contact with underground facility to each affected operator that has facilities recorded with the notification center in the area of a proposed excavation site.

(c) For operators of tier 2 facilities that desire direct contact with the excavator, the notification center shall provide the excavator with the name and contact information of the affected operator that has facilities recorded with the notification center in the area of the proposed excavation.

(d) Notification to operators as defined in subsection (b) shall be given by notifying the notification center by telephone at the toll free number or by other communication methods approved by the notification center. The content of such notification shall be as required by K.S.A. 66-1804, and amendments thereto.

(e) Notification to operators as defined in subsection (c) may be given by notifying the operator of tier 2 facilities using the contact information provided by the notification center. The content of such notification shall be as required by K.S.A. 66-1804, and amendments thereto.

(f) Each operator who has an underground facility within the state shall be afforded the opportunity to become a member of the notification center on the same terms as the original members.

(g) A suitable record shall be maintained by the notification center to document the receipt of notices from excavators as required by this act.

(h) A suitable record shall be maintained by operators of tier 2 facilities that desire direct contact with the excavator pursuant to subsection (c) to document the receipt of notices from excavators.

(i) The notification center shall charge and collect an annual membership fee in the amount of $25 from each tier 2 facility member.

(j) The notification center shall charge a referral fee to tier 2 facility members in an amount no more than 50% of the referral fee rate charged to tier 1 facility members.

(k) Upon request of the operator, the person filing the notice of intent to excavate shall whiteline the proposed excavation site prior to locates being performed.

(l) The notification center established pursuant to this section shall be and is hereby deemed to be a public agency and shall be subject to the provisions of the open records act, K.S.A. 45-215 et seq., and amendments thereto, and the open meetings act, K.S.A. 75-4317 et seq., and amendments thereto, except that the notification center or board of directors, or successor managing organization, shall not disseminate, make available or otherwise distribute data or information provided by an operator of a tier 1, 2 or 3 facility unless such dissemination, making available or distributing is necessary for the state corporation commission or the notification center to carry out legal duties or specific statutory duties prescribed under this chapter.

(m)(l) On and after July 1, 2009, The notification center's board of directors shall include two members from tier 2 facilities and one member from tier 3 facilities.

(n)(m) The notification center shall prepare an annual report which that describes the activities of such center. An annual audit of the notification center shall be conducted by an independent certified public accountant. The notification center shall provide copies of such reports to each member of the notification center and shall be subject to the open records act, K.S.A. 45-215 et seq., and amendments thereto.

(o)(n) The notification center shall solicit proposals for operation of the notification center not more than every five years which shall be awarded in an open meeting by the board of directors of the notification center. The bidding process prescribed by this subsection shall be subject to the open records act, K.S.A. 45-215 et seq., and amendments thereto.

(p)(o) The notification center shall conduct a cost of service audit not more than every five years or as otherwise requested by the board of directors of the notification center or a majority of the members of such center.

(q)(p) On and after July 1, 2019, The notification center shall notify any person or excavator requesting identification of the location of underground facilities that utilities are only required to identify the location of utility-owned facilities and are not required to identify the location of privately owned facilities.

Sec. 4. K.S.A. 2022 Supp. 66-1806 is hereby amended to read as follows: 66-1806. (a) Within two working days Except as provided by subsection (j), beginning on the later of the first working day after the excavator has filed notice of intent to excavate or the first day after the excavator has whitelined the excavation site, an operator served with notice, unless otherwise agreed between the parties, shall inform the excavator of the tolerance zone of the underground facilities of the operator in the area of the planned excavation by marking, flagging or other acceptable method.

(b) If the operator of tier 2 facilities cannot accurately mark the tolerance zone, such operator shall mark the approximate location to the best of its ability, notify the excavator that the markings may not be accurate, and provide additional guidance to the excavator in locating the facilities as needed during the excavation.

(c) The operator of tier 2 facilities shall not be required to provide notification of the tolerance zone for facilities which that are at a depth at least two feet deeper than the excavator plans to excavate but does have to notify the excavator of their existence.

(d) (1) If the operator of a tier 1 facility has no underground facilities in the area of the proposed excavation, such operator, before the excavation start date, shall notify the excavator that it has no facilities in the area of proposed excavation by telephone, facsimile, marking the area all clear or by other technology that may be developed for such purposes.

(2) If the operator of a tier 1 facility is a provider of electricity, the duty of the operator to mark shall not extend to another person's side of the point where ownership of the facility changes from the operator to another person as determined by the operator's rules and regulations, tariffs, service or membership agreements or other similar documents.

(e) If the excavator notifies the notification center, within two working days after the initial identification of the tolerance zone by the operator, that the identifiers have been improperly removed or altered, the operator shall make a reasonable effort to reidentify the tolerance zone within one working day after the operator receives actual notice from the notification center.

(f) If the excavator has provided notice to an operator pursuant to K.S.A. 66-1804, and amendments thereto, and the operator fails to comply with subsections (a), (b) or (c) or notifies the excavator that it has no underground facilities in the area of the planned excavation, the excavator may proceed and shall not be liable to the operator for any direct or indirect damages resulting from contact with the operator's facilities, except that nothing in this act shall be construed to hold any excavator harmless from liability to the operator in those cases of gross negligence or willful and wanton conduct.

(g)(f) For economic damages in any civil court of this state, failure of an operator to inform the excavator within two working days before the excavation start date of the tolerance zone of the underground facilities of the operator in the manner required by K.S.A. 66-1806(a), and amendments thereto, shall not give rise to a cause of action on the part of the excavator against an operator, except that nothing in this act shall be construed to hold any operator harmless from liability in those cases of inaccurate marking of the tolerance zone, gross negligence or willful and wanton conduct. Such failure may subject an operator to civil penalties as determined by the state corporation commission.

(h)(g) Any person claiming that an operator has failed to inform the excavator within two working days of the tolerance zone of the underground facilities of the operator shall file a complaint with the state corporation commission requesting enforcement of subsection (a) within one year of becoming aware of the violation.

(i)(h) All tier 1 facilities installed by an operator after January 1, 2003, shall be locatable.

(j)(i) All tier 2 facilities installed by an operator after July 1, 2008, shall be locatable.

(j) Notwithstanding the provisions of subsection (a), the maximum number of days allowed to an operator for providing the location of the tolerance zone may be adjusted by the state corporation commission in accordance with rules and regulations.

Sec. 5. K.S.A. 66-1810 is hereby amended to read as follows: 66-1810. When any contact with or damage to any underground facility occurs, the operator shall be informed immediately by the excavator shall immediately notify the operator and the notification center. Upon receiving such notice, the operator immediately shall dispatch personnel to the location to provide necessary temporary or permanent repair of the damage. If the protective covering of an electrical line is penetrated or dangerous gases or fluids are escaping from a broken line, the excavator immediately shall inform emergency personnel of the municipality in which such electrical short or broken line is located and take any other action as may be reasonably necessary to protect persons and property and to minimize hazards until arrival of the operator's personnel, emergency medical responders or first responders.

Sec. 6. K.S.A. 66-1804 and 66-1810 and K.S.A. 2022 Supp. 66-1802, 66-1805 and 66-1806 are hereby repealed.

Sec. 7. This act shall take effect and be in force from and after January 1, 2024, and its publication in the statute book.

Approved April 7, 2023.