Government Website icon

The .gov means it's official.
A .gov website belongs to an official government organization in the United States.

Padlock icon

The site is secure.
The https:// or lock icon ensures you're safely connected to the website and any information you provide is encrypted.

Publications iconKansas Register

Volume 41 - Issue 51 - December 22, 2022

State of Kansas

Department of Transportation

Notice to Contractors

Electronic copies of the letting proposals and plans are available on the Kansas Department of Transportation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.

KDOT will only accept electronic internet proposals using the Bid Express website at http://www.bidx.com until 1:00 p.m. (CST) January 18, 2023. The KDOT bid letting will be conducted remotely by audio broadcast only at 3:00 p.m. local time Wednesday, January 18, 2023. To join the conference call, dial 866-620-7326 and enter conference code 5895748207. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.

Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.

District One – Northeast

Atchison – 73-3 KA-3889-01 – US-73, bridge #014 over Walnut Creek Drainage located 4.6 miles northwest of the US-73/K-74 junction, bridge replacement. (Federal Funds)

Johnson – 435-46 KA-5500-02 – I-435, from the K-10/I-435 junction north to Midland Drive in Shawnee and Lenexa, guard fence, 4.0 miles. (Federal Funds)

Johnson – 635-46 KA-5501-02 – I-635, from Foster Street north to the Wyandotte/Johnson County line, guard fence, 0.6 mile. (Federal Funds)

Wyandotte – 635-105 KA-5502-02 – I-635, from the Wyandotte/Johnson County line north to the south approach of the Burlington Northern and Santa Fe Railroad bridges, and from 750 feet north of 43rd Street north to the I-635/K-5 junction in Kansas City, guard fence, 4.9 miles. (Federal Funds)

Statewide – 106 KA-6254-01 – US-24, K-237, K-4, K-245 and US-40 in the Jefferson, Shawnee and Douglas counties, signing. (Federal Funds)

District Two – North Central

Dickinson – 21 KA-6872-01 – K-15, from the Marion/Dickinson County line north to the west K-15/K-18 junction (excluding the City of Abilene) and K-18, from the K-15/K-18 junction east to the Dickinson/Geary County line, crack repair, 35.7 miles. (State Funds)

Geary – 57-31 KA-6873-01 – K-57, from the north city limits of Junction City to the US-77/K-57/K-244 junction, crack repair, 2.3 miles. (State Funds)

Geary – 18-31 KA-6874-01 – K-18, from approximately a half mile west of Spring Valley Road east to approximately 475 feet west of Spring Valley Road (west of the north US-77/K-18 junction), milling and overlay, 0.3 mile. (State Funds)

Washington – 101 KA-6868-01 – US-36, from the west US-36/K-22 junction east to the Little Blue River bridge excluding the City of Washington; K-22, from the US-36/K-22 junction north to the south city limits of Haddam; and K-148, from the K-9/K-148 junction north to the US-36/K-148 junction, crack repair, 27.3 miles. (State Funds)

Statewide – 106 KA-6869-01 – K-15, from the north city limits of Clay Center north to the Clay/Washington County line at the K-9/K-15 junction and K-80, from the east city limits of Morganville east to the K-15/K-80 junction; K-9, from the Clay/Washington County line north to the west K-9/K-15/K-148 junction; K-115, from the east city limits of Palmer east to the K-9/K-15/K-115 junction; and K-15, from the west K-9/K-15/K-148 junction north to the east US-36/K-15 junction, crack repair, 35.5 miles. (State Funds)

District Three – Northwest

Decatur – 83-20 KA-6716-01 – US-83, from the Sheridan/Decatur County line north 9.0 miles to the beginning of the 10-foot shoulders, milling and overlay, 9.0 miles. (State Funds)

Gove – 70-32 KA-6798-01 – I-70, light towers 032L0009, 032L0010, 032L0012 and 032L0013 near the eastbound and westbound rest stops, lighting, 4.0 miles. (State Funds)

Logan – 40-55 KA-6638-01 – US-40, from approximately 502 feet east of the east K-25/US-40 junction east to the Portland Cement Concrete Pavement at the west US-83/US-54 junction, milling and overlay, 9.8 miles. (Federal Funds)

Russell – 281-84 KA-6639-01 – US-281, from the Barton/Russell County line north to the south city limits of Russell, ultra-thin bonded asphalt surfacing, 11.7 miles. (Federal Funds)

Sheridan – 83-90 KA-6715-01 – US-83, from the K-383/US-83 junction north to the Sheridan/Decatur County line, milling and overlay, 0.6 mile. (State Funds)

Smith – 281-92 KA-3937-01 – US-281, bridge #021 over Lindley Creek located approximately 686 feet west of the Osborne County line, bridge replacement. (Federal Funds)

Statewide – 106 KA-6265-01 – K-211, K-212, K-216, K-23, K-23A and K-23S in Gove, Sheridan, Logan and Trego counties, signing. (Federal Funds)

District Four – Southeast

Crawford – 69B2-19 KA-5985-01 – US-69B2, from Washington Street to the north city limits of Arma, pavement reconstruction, 0.4 mile. (Federal Funds)

District Five – South Central

Cowley – 166-18 KA-6774-01 – US-166, bridge #089 over Walnut River located 4.6 miles east of the south K-177/US-166 junction, bridge repair. (Federal Funds)

Sedgwick – 54-87 KA-6179-01 – US-54, along US-54 between West Street and Armour Street in Wichita, intelligent transportation systems, 7.7 miles. (State Funds)

Sedgwick – 235-87 KA-6844-01 – I-235, from the south I-135/I-235 junction north 14.5 miles to just west of Seneca Street in Wichita, pavement patching, 14.5 miles. (Federal Funds)

District Six – Southwest

Clark – 13 TE-0488-01 – Main Street from 9th Avenue to 7th Avenue and from the north side of 8th Avenue one half block in each direction from Main Street in Ashland, landscaping and beautification, 0.2 mile. (Federal Funds)

Finney – 23-28 KA-6880-01 – K-23, from the west K-23/K-156 junction north to the Finney/Lane County line, milling and overlay, 14.1 miles. (State Funds)

Grant – 160-34 KA-5986-01 – US-160, from 264 feet west of Comanche Street to Cheyenne Street in Ulysses, grading and surfacing, 0.3 mile. (Federal Funds)

Julie Lorenz
Secretary

Doc. No. 050738