Volume 44 - Issue 17 - April 24, 2025
State of Kansas
Department of Transportation
Notice to Contractors
Electronic copies of the letting proposals and plans are available on the Kansas Department of Transporatation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.
KDOT will only accept electronic Internet proposals using the Bid Express website at https://bidx.com/ks/main until 1:00 p.m. (Central Time) on letting day. The KDOT bid letting will be conducted remotely by audio broadcast only at 3:00 p.m. (Central Time) on letting day. For the conference call information see https://www.ksdot.org/bureaus/burconsmain/lettinginfo.asp. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.
Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.
Projects for the May 21, 2025 Letting
District One – Northeast
Atchison: 3 U-2497-01 – Bridge, in Atchison over Brewery Creek on Patriot Street located 0.1 miles west of US-73, bridge replacement, 0.1 miles. (Federal Funds)
Johnson: 69-46 KA-7676-01 – US-69, from 0.06 miles south of West 103rd Street north 2.55 miles, pavement marking, 2.6 miles. (Federal Funds)
Johnson: 435-46 KA-7677-01 – I-435, from 0.37 miles northwest of Lackman Road north 2 miles, pavement marking, 0.4 miles. (Federal Funds)
Lyon: 99-56 KA-7680-01 – K-99, from the Greenwood/Lyon County line north to the Emporia south city limits, milling and overlay, 15.5 miles. (State Funds)
Riley: 177-81 KA-7660-01 – K-177, from the Geary/Riley County line north to the K-177/K-18 junction, milling and overlay, 7.0 miles. (Federal Funds)
Wabaunsee: 4-99 KA-6763-01 – K-4, culvert #533 over South Bridge Mission Creek Drainage located 5.07 miles northeast of the K-99/K-4 east junction, culvert. (State Funds)
Wyandotte: 70-105 KA-7311-01 – Bridge #211 and #212, located 0.2 miles west of the I-435/I-70 junction, bridge paint. (State Funds)
Wyandotte: 70-105 KA-7310-01 – Bridge #250, located 1.07 miles east of US-69, bridge paint. (State Funds)
District Two – North Central
Chase: 177-9 KA-5677-01 – K-177, culvert #514 over Fox Creek Drainage located 5.14 miles north of the K-177/US-50 junction, culvert. (Federal Funds)
Geary: 177-31 KA-7659-01 – K-177, from 1 mile south of the Geary/Riley county line north to the Geary/Riley county line, milling and overlay, 1.0 miles. (State Funds)
Morris: 64 C-5280-01 – Bridge, located over the West Fork Neosho River 2.2 miles south and 0.6 miles east of White City, bridge replacement, 0.1 miles. (Federal Funds)
Statewide: 106 KA-7257-01 – US-81, K-41, K-18 and K-106 in Ottawa, Dickinson, Cloud, Saline, and Lincoln counties, signing. (State Funds)
District Three – Northwest
Ellis: 70-26 KA-7609-01 – I-70, bridge #024 carrying Toulon Avenue over I-70 located 4.35 miles east of the US-183 junction, bridge repair. (Federal Funds)
Ellis: 70-26 KA-7608-01 – I-70, bridge #006 carrying 240th Avenue/Hall Street over I-70 located 1.10 miles east of the US-183A junction, bridge repair. (Federal Funds)
Ellis: 183-26 KA-7615-01 – US-183, bridge #059 over the Saline River located 13.85 miles north of the I-70 junction, bridge. (State Funds)
Graham: 33 C-5290-01 – Bridge, located over Bow Creek 6.0 miles south and 1.3 miles east of Densmore, bridge replacement, 0.3 miles. (Federal Funds)
Sherman: 91 C-5294-01 – Bridge, located over Tributary to South Fork of Sappa Creek 1.4 miles north and 3.0 miles east of Edson, bridge replacement, 0.2 miles. (Federal Funds)
Statewide: 106 KA-7280-01 – US-83, US-36, K-383, K-123, and K-223 in Decatur, Rawlins, Sheridan, and Norton counties, signing. (State Funds)
District Four – Southeast
Allen: 1 C-5293-01 – Bridge, located over Elm Creek 0.5 miles south and 3.2 miles west of Moran, bridge replacement, 0.1 miles. (Federal Funds)
Crawford: 69-19 KA-7230-01 – Signal improvements at US-69B1/Centennial Drive in Pittsburg, traffic signals. (State Funds)
Statewide: 106 KA-7667-01 – Various locations in Allen, Greenwood, Linn, Neosho, and Wilson counties, mudjacking. (State Funds)
District Five – South Central
Sedgwick: 96-87 KA-7618-01 – K-96, bridge #280 carrying Tyler Road over K-96 located at the Tyler Road/K-96 junction, bridge. (State Funds)
Sedgwick: 54-87 KA-7675-01 – US-54, from the concrete west of South Meridian Avenue east to east edge wearing surface of Washington Street bridge and all ramps, pavement marking, 3.0 miles. (Federal Funds)
Statewide: 106 KA-7288-01 – US-281, US-54/US-400, K-42, K-61 and US-50 in Pratt, Stafford, Reno, Kingman, Barber, and Kiowa counties, signing. (State Funds)
District Six – Southwest
Finney: 83-28 KA-1008-04 – US-83, from 2.5 miles north of the Haskell/Finney County line north to the south edge wearing surface of bridge #015 over the Arkansas River, grading, bridge and surfacing, 12.7 miles. (Federal Funds)
Grant: 160-34 KA-5986-01 – US-160, geometric improvements in Ulysses from 0.05 miles west of South Comanche Street to South Stubbs Road, grading and surfacing, 0.5 miles. (Federal Funds)
Calvin Reed
Secretary
Department of Transportation
Doc. No. 053046