Project
Rehab of Detention Dam Site 5 in Woodson County, KS located 2.5 miles west and 6.0 miles south of Gridley, Kansas for Big Creek Watershed Joint District No. 48.
General Scope of Work
Rehabilitation of dam with 740 tons of riprap for wave protection and 70 tons of riprap for stilling basin and 30 tons of riprap for fence barriers totaling 840 tons of riprap repair; 105 feet of new 14-inch PVC principal spillway pipe with canopy inlet; 150-feet of 6-inch PVC drawdown pipe and materials; 12-cubic yards of drainage diaphragm fine sand; associated earthwork; seeding and mulching.
Site Showing
(Non-mandatory) 9:00 a.m. (Central Time) Wednesday, June 4, 2025, at 873 Dobbin Rd., Gridley, KS 66852.
Bid Opening
9:00 a.m. (Central Time) Wednesday, June 11, 2025, at 873 Dobbin Rd. Gridley, KS 66852. Sealed bids will be received by Matt Miller, Engineering Technician, 1524 W. 217th St., Osage City, KS 66523 until 5:00 p.m. the day prior to the opening, or it may be delivered at the time of the opening. Any bid received after the specified times will not be considered.
Bid Documents
Bid documents (constituting Project Manual and Construction Plans) may be submitted as a hard copy or electronically by contacting Matt Miller, Engineering Technician, 1524 W. 217th St., Osage City, KS 66523 at 785-230-4354 or mmiller1@eocene.com.
For any questions pertaining to the project listed above, please contact Matt Miller, Engineering Technician at 785-230-4354 or mmiller1@eocene.com.
Steve Frost
Executive Director
Division of Conservation
Department of Agriculture
Doc. No. 053018