The Kansas Department of Transportation (KDOT) is seeking a qualified consulting firm, or team of firms, to perform construction inspection services on multiple projects in various counties. Summary information for each project is provided below in Table 1. Interested consultants must upload a proposal by 12:00 p.m. (Central Time) July 31, 2024, to the Bid Express page to be considered for selection.
Consultant Prequalification
Interested consulting firms must be prequalified by KDOT or otherwise demonstrate qualification in the following category(s):
- 241 – Construction Inspection and Testing
If a firm is not currently prequalified by KDOT in any of the required categories, a proposal may still be submitted. Firms not prequalified must also provide documentation that demonstrates the firm is qualified for each specified category listed in this solicitation for the project. Firms must use the KDOT prequalification form to provide this documentation. KDOT 1050 Prequalification Category Definitions (Blue Book) can be found at http://www.ksdot.org/descons.asp. Consultants may create a team to meet the prequalification requirements. All firms doing business with KDOT must be registered and in good standing under the laws of the State of Kansas at the time of contracting and must comply with applicable state and federal laws, rules, and regulations.
Background and Scope of Projects
With this single solicitation, KDOT is requesting consulting services for construction inspections on the projects listed in Table 1. This table provides summary information for the projects. One consultant will be selected to perform services associated with the group (Group) listed.
Table 1: Summary of Project Information | |||||||
---|---|---|---|---|---|---|---|
Group | RT-CO | Project # | Scope, County | Anticipated Start | Working Days or CCD | Office | Comments |
24121 | I070-089 | KA-1266-04 | Grading, Bridge, and Surfacing Shawnee |
Topeka/Emporia | |||
24409 | U075-063 | KA-5699-01 | Grading, Bridge, and Surfacing Montgomery |
September 30, 2024 | 225 | Independence |
Additional project information including construction scope to be inspected, a detailed description of the project location, and resources and inspection scope specifically requested from consultants in this request can be viewed in an online table at https://ike.ksdot.gov/about/construction-inspection-rfps. Upon publication of this Request for Proposals, KDOT anticipates each of these inspection efforts will require full teams (project manager and inspectors, as opposed to single role staff augmentation as is occasionally request) for various types of construction inspection except as noted in the table. Watch the website linked above for updated information. Tabulated information (both in this Request for Proposals and on the website) shall not be relied upon during inspections. It is provided for the convenience of consultants, specifically to aid in making decisions about which projects they are interested in performing.
Specific project needs are subject to modification and/or cancellation at KDOT’s discretion.
Anticipated Consultant Scope
The scope of construction inspection services and certifications required for the projects and are listed in the table available on the website noted above. Inspection efforts will be managed out of the offices listed.
Anticipated Schedule and Key Dates
- Proposals are due by or before 12:00 p.m. (Central Time) July 31, 2024.
- Ranking of proposals is expected to occur on or around August 2, 2024. Negotiations with the most highly ranked firm are expected to begin on or around August 16, 2024. An executed agreement is anticipated shortly thereafter.
- Anticipated scope starts dates and working days or anticipated calendar completion dates are shown in the table. All dates are subject to change.
Instructions for Proposal
- No cost or pricing information shall be submitted with the proposal. Proposals including cost or pricing information will be considered non-responsive and withdrawn from further consideration.
- The consultant’s proposal must not exceed the page limit laid out in Table 2 below (including any cover letter, index, etc.). All pages shall be standard letter size (8.5” x 11”). Any page larger than standard letter size will be counted as two or more pages depending on size.
- A single PDF (10MB maximum size) of the proposal including all attachments must be uploaded to the appropriate bid form on Bid Express by the proposal due date and time.
- The proposal PDF file name must read:
- “ConstInsp Project 2024.07 Release FIRM NAME”
- The proposal must be accompanied by Special Attachments No. 8 (“Tax Clearance Certificate”), No. 10 (“Policy Regarding Sexual Harassment”), and No. 12 (“Certification of Company Not Currently Engaged in the Procurement or Obtainment of Certain Equipment, Services, or Systems”). If you need a Tax Clearance Certificate, you can request one at https://www.ksrevenue.gov/taxclearance.html. Allow 2-3 business days for processing. Both attachments are required for every firm involved in a multi-consultant team. Upload these files as instructed in Bid Express.
- The outline in Table 2 below describes the expected proposal organization, content sections, and limits on number of pages.
- Each team is limited to a single, one-page cover letter.
- Describe the approach they plan to execute to deliver success on the project.
- Present the relevant qualifications and experience of the people they are proposing will provide the services.
- Provide the firm’s familiarity with KDOT and the project area.
- Finally, consultants are limited to a single, on-page descriptions of general qualifications (“Past Performance” selection plus “Approach to Quality Control” section) regardless of the number of projects in which they are expressing interest.
- Table 3 lists the evaluation criteria and associated weights which will be used to make a selection.
- Although not anticipated at this time, KDOT reserves the right to interview for the requested services associated with any of the listed projects prior to making final selections.
Table 2: Proposal Content | ||
---|---|---|
Section | Description of Intent | Page Limit |
Cover Letter | 1 Page | |
Consultant Project Interest and Preference | Fill out “July 2024 Construction Inspections Interest & Preference Form” and submit with your proposal. | 1 Page |
Project Approach | Describe how your firm will meet the fluctuating inspection needs of the project. | 2 Pages per project in which team is interested |
Qualifications and Experience | For key personnel to be assigned to the project provide names, qualifications, education, training, and expertise. Identify their area(s) of responsibility and percent of their time dedicated to the project. List work for which you do not have in-house capability and name the firm you propose to subcontract with. | |
Familiarity with KDOT and Project Area | Describe team’s familiarity with KDOT’s inspection processes and standards. Describe familiarity with the project area and any identified special site conditions. | |
Past Performance | Describe team’s past performance with respect to ability to meet project schedules; quality of work; and ability to control costs on similar transportation projects, especially those performed for KDOT. Include three references and contact information. | 1 Page total |
Approach to Quality Control | Describe methods or procedures your firm will use to provide all services with professional quality and technical accuracy. |
Table 3: Evaluation Factors | |
---|---|
Evaluation Factor | Weight |
The quality and completeness of the response | 10% |
Availability to respond to the work | 20% |
Qualifications and experience of project manager and other key project team members proposed for services | 20% |
Past performance history for similar projects/services for KDOT | 20% |
Understanding of the project area | 10% |
Understanding of KDOT contract administration and closeout procedures | 20% |
Contract Terms and Conditions
A standard KDOT agreement for engineering and technical services will be used for professional services projects. The following special attachments will need to be provided by the selected consultant and all subconsultants with the signed work order following negotiations and will become attachments to the contract.
- Special Attachment No. 8 (“Tax Clearance Certificate”)
- Special Attachment No. 10 (“Policy Regarding Sexual Harassment”)
- Special Attachment No. 12 (“Certification of Company Not Currently Engaged in the Procurement or Obtainment of Certain Equipment, Services, or Systems”)
Questions
All questions regarding this Request for Proposals shall be submitted via Q&A section of bid form in Bid Express.
Questions can be submitted until July 18, 2024; answers will be provided to all prequalified consultants on July 25, 2024.