Government Website icon

The .gov means it's official.
A .gov website belongs to an official government organization in the United States.

Padlock icon

The site is secure.
The https:// or lock icon ensures you're safely connected to the website and any information you provide is encrypted.

Publications iconKansas Register

Volume 42 - Issue 46 - November 16, 2023

State of Kansas

Department of Transportation

Notice to Consulting Firms

The Kansas Department of Transportation (KDOT) is seeking a qualified consulting firm or team of firms to perform professional services for the project scope described. Interested consultants must submit a proposal as laid out herein by 12:00 p.m. (Central Time) December 6, 2023, to be considered for selection.

Consultant Prequalification

Interested consulting firms must be prequalified by KDOT or otherwise demonstrate qualification in categories:

  • 163 – Congestion Management/ITS

If a firm is not currently prequalified by KDOT, a proposal may still be submitted. Firms not prequalified must also provide documentation that demonstrates the firm is qualified for each specified category listed in this notice for the project. Firms must use the KDOT prequalification form to provide this documentation. KDOT 1050 Prequalification Category Definitions (Blue Book) can be found at http://www.ksdot.org/descons.asp. Consultants may create a team to meet the prequalification requirements. All firms doing business with KDOT must be registered and in good standing under the laws of the State of Kansas at the time of contracting and must comply with applicable state and federal laws, rules, and regulations.

Anticipated Consultant Scope

Identify and design 7-9 road-side Dynamic Message Signs (DMS) locations with cabinet mounted CCTV Cameras and associated fiber or cellular connections along multiple safety corridors on I-135, US-50, US-169, and US-24 and other key locations statewide. Meet with District staff and KDOT ITS and Safety staff to review needs, analyze cost/benefit criteria and finalize locations. KDOT ITS standard drawings will be used for DMS structure design.

Please provide a scope of services/proposal to perform the following tasks:

  1. Project management.
  2. Pre-Design: Including kick-off and biweekly coordination meetings, field review, utility coordination, and engineer’s estimate.
  3. Prepare 95% plans (final date to be determined after award): including base mapping, quality control review, incorporation of KDOT ITS specifications, traffic control plans, and engineering estimates.
  4. Prepare final plans 1 month after 95% submittal: Incorporate KDOT design comments, finalize plans sheets.
  5. Provide Post-Letting Construction Support services such as progress meetings, submittal and shop drawing reviews, addressing construction questions, and plan sheet revisions if necessary.

Anticipated Schedule and Key Dates

  1. Proposals are due by or before 12:00 p.m. (Central Time) December 6, 2023.
  2. Anticipated Start Date: February 1, 2024.
  3. Anticipated Calendar Completion Date: To be based on Schedule developed during Design.
  4. Ranking of proposals is expected to occur on or around December 8, 2023.
  5. Negotiations with the most highly ranked firm are expected to begin on or around January 5, 2023. An executed agreement is anticipated around February 1, 2024.

Instructions for Proposal

  1. No cost or pricing information shall be submitted with the proposal. Proposals including cost or pricing information will be considered non-responsive and withdrawn from further consideration.
  2. The consultant’s proposal must not exceed 4 pages total (including any cover letter, index, etc.). All pages shall be standard letter size (8.5” x 11”). Any page larger than standard letter size will be counted as two or more pages depending on size.
  3. A single PDF (10MB maximum size) of the proposal including all attachments must be uploaded to the appropriate bid form on Bid Express by the proposal due date and time.
  4. The PDF file name must read:
    1. “KA-6864-01 – Safety Corridor DMS and Cameras FIRM NAME”
  5. The proposal must be accompanied by Special Attachments No. 8 (“Tax Clearance Certificate”) and No. 10 (“Policy Regarding Sexual Harassment”). If you need a Tax Clearance Certificate, you can request one at https://www.ksrevenue.gov/taxclearance.html. Allow 2-3 business days for processing.
  6. The outline in Table 1 below describes the expected proposal organization and content sections.
  7. Table 2 lists the evaluation criteria and associated weights which will be used to make a selection.
  8. Depending on the number and quality of responses received, KDOT anticipates shortlisting (based on proposals) and holding interviews prior to final selection (which may be based on both proposals and interview content). If KDOT deems them necessary, evaluation criteria for interviews will be distributed to shortlisted consultant teams in advance.

Table 1: Proposal Content
Section Description of Intent Page Limit
Cover Letter (No more than 1 page)
Project Approach Describe how your firm will approach the project design efficiently and meet the fluctuating inspection needs of the project. Include any unique, cost-effective, and/or optimized solutions planned for the design.
Approach to Quality Control Describe methods or procedures your firm will use to provide all services with professional quality and technical accuracy.
Qualifications and Experience For key personnel to be assigned to the project provide names, qualifications, education, training, and expertise. Identify their area(s) of responsibility and percent of their time dedicated to the project. List work for which you do not have in-house capability and name the firm you propose to subcontract with.
Past Performance Describe team’s past performance with respect to ability to meet project schedules; quality of work; and ability to control costs on similar transportation projects, especially those performed for KDOT. Include three references and contact information.
Familiarity with KDOT and Project Area Describe team’s familiarity with KDOT’s inspection processes and standards. Describe familiarity with the project area and any identified special site conditions.

Table 2: Evaluation Factors
Evaluation Factor Weight
The quality and completeness of the response 10%
Qualifications and experience of project manager and other key project team members proposed for services 25%
Proposed Project Approach 20%
Availability to respond to the work 20%
Past performance history for similar projects/services for KDOT 25%

Contract Terms and Conditions

A standard KDOT agreement for engineering and technical services will be used for professional services projects. The following special attachments will need to be provided by the selected consultant and all subconsultants with the signed work order following negotiations and will become attachments to the contract.

  • Special Attachment No. 8 (“Tax Clearance Certificate”)
  • Special Attachment No. 10 (“Policy Regarding Sexual Harassment”)

Questions

All questions regarding this Request for Proposals shall be submitted via Q&A section of bid form in Bid Express.

Questions can be submitted until November 16, 2022; answers will be provided to all prequalified consultants on November 29, 2023.

Calvin Reed
Secretary
Department of Transportation

Doc. No. 051644