Volume 42 - Issue 42 - October 19, 2023
State of Kansas
Department of Transportation
Notice to Contractors
Electronic copies of the letting proposals and plans are available on the Kansas Department of Transportation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.
KDOT will only accept electronic Internet proposals using the Bid Express website at https://bidx.com/ks/main until 1:00 p.m. (Central Time) on letting day. The KDOT bid letting will be conducted remotely by audio broadcast only at 3:00 p.m. (Central Time) on letting day. For the conference call information see https://www.ksdot.org/bureaus/burconsmain/lettinginfo.asp. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.
Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.
Projects for the Nov. 15, 2023, letting.
District One – Northeast
Atchison: 9-3 KA-7006-01 – K-9, from the east US-159/K-9 junction east to the US-73/K-9 junction, milling and overlay, 4.9 miles. (Federal Funds)
Atchison: 9-3 KA-7057-01 – K-9, from the Jackson/Atchison County line east to the US-159/K-9 west junction, recycle and overlay, 2.0 miles. (Federal Funds)
Brown: 246-7 KA-7045-01 – K-246, from the US-75/K-246 junction east to the west city limits of Morrill, milling and overlay, 5.6 miles. (State Funds)
Douglas: 56-23 KA-7236-01 – US-56, from the US-59/US-56 junction, east to Baldwin City, sealing, 3.4 miles. (State Funds)
Jackson: 62-43 KA-7116-01 – K-62, from the K-16/K-62 junction north to the Jackson/Nemaha County line, milling and overlay, 7.3 miles. (Federal Funds)
Jackson: 9-43 KA-7118-01 – K-9, from the US-75/K-9 junction east to the Jackson/Atchison County line, recycle and overlay, 10.3 miles. (Federal Funds)
Jefferson: 4-44 KA-5931-01 – K-4; beginning at 0.08 mile north of the north K-4/K-16 junction, and 0.22 mile north of the north K-4/K-16 junction, guard fence, 0.1 mile. (Federal Funds)
Johnson: 69-46 KA-7161-01 – US-69, from West 56th Street north to West 52nd Street, milling and overlay, 0.8 mile. (State Funds)
Johnson: 7-46 KA-6923-01 – Bridge #242, on West 83rd Street over K-7 located 2.50 miles north of the K-7/K-10 junction in Shawnee, bridge repair. (Federal Funds)
Leavenworth: 73-52 KA-5990-01 – US-73/K-92/K-7, from Choctaw Street to Seneca Street, grading and surfacing, 0.3 mile. (Federal Funds)
Lyon: 35-56 KA-6929-01 – Bridge #131, over Road 173 located 1.11 miles east of the I-35/K-130 junction, bridge repair. (State Funds)
Marshall: 58 KA-7055-01 – K-9, from the Washington/Marshall County line east to the US-77/K-9 west junction; US-36, from the Washington/Marshall County line east to 6.7 miles east of the Washington/Marshall County line; US-77, from the K-9/US-77 west junction east to the south city limits of Marysville, pavement patching, 49.9 miles. (State Funds)
Nemaha: 62-66 KA-7117-01 – K-62, from the Jackson/Nemaha County line north to the K-9/K-62 junction, milling and overlay, 6.0 miles. (Federal Funds)
Wyandotte: 635-105 KA-5717-01 – I-635 bridge #036, located over I-635 (Metropolitan Avenue) 1.11 miles south of old K-132, bridge replacement. (Federal Funds)
Statewide: 56-106 KA-7146-01 – US-56; from the Douglas/Johnson County line east to the west city limits of Gardner in Johnson County, and from Baldwin City east to the Johnson/Douglas County line in Douglas County, milling, and overlay, 12.2 miles. (State Funds)
Statewide: 169-106 KA-7235-01 – US-169; from the Miami/Johnson County line north to the 175th Street/US-169 junction in Johnson County, and from 1.416 miles south of the Miami/Johnson County line north to the Miami/Johnson County line in Miami County, ultra-thin bonded asphalt surfacing, 6.9 miles. (State Funds)
District Two – North Central
Chase: 50-9 KA-7166-01 – US-50, from 0.9 mile east of the east city limits of Strong City east to the portland cement concrete pavement (PCCP) by Saffordville, milling and overlay, 9.5 miles. (Federal Funds)
Marion: 57 KA-7164-01 – US-50, from 0.25 mile east of the Harvey/Marion County line east to the west city limits of Florence; US-56, from 0.17 mile north of the US-77/K-150 junction north 0.07 mile south of the south city limits of Lincolnville; and K-256, from the US-56/K-256 junction east to the US-77/K-256 junction, milling and overlay, 28.3 miles. (Federal Funds)
Saline: 143-85 KA-7165-01 – K-143, from the I-70/K-143 junction north to the US-81/K-143 junction, milling and overlay, 4.7 miles. (State Funds)
District Three – Northwest
Decatur: 9-20 KA-7174-01 – K-9, from the Sheridan/Decatur County line east to the Norton/Decatur County line, milling and overlay, 7.2 miles. (Federal Funds)
Logan: 25-55 KA-7046-01 – K-25, from the US-40/K-25 east junction north to the Thomas/Logan County line, milling and overlay, 2.3 miles. (State Funds)
Phillips: 183-74 KA-7169-01 – US-50, from the Rooks/Phillips County line north to the US-183/US-36 east junction, milling and overlay, 13.2 miles. (Federal Funds)
Sheridan: 9-90 KA-7167-01 – K-9, from the K-123/K-9 junction east to the Sheridan/Decatur County line, milling and overlay, 6.4 miles. (Federal Funds)
Sherman: 70-91 KA-6947-01 – I-70 bridge #008, located over South Fork Beaver Creek Drainage 7.30 miles east of the Colorado state line, bridge repair. (State Funds)
Thomas: 24-97 KA-7170-01 – US-24, from the east city limits of Colby east 0.04 mile east of the US-83/US-24 junction, milling and overlay, 8.6 miles. (Federal Funds)
Thomas: 25-97 KA-7053-01 – K-25, from the Thomas/Logan County line north to the south city limits of Colby, milling and overlay, 15.5 miles. (Federal Funds)
Thomas: 70-97 KA-6942-01 – I-70 bridges #017 and #018, located over K-25 at the I-70/K-25 junction in Colby, bridge repair. (State Funds)
District Four – Southeast
Linn: 52-54 KA-7021-01 – K-52; from the K-31/K-52 junction east to the K-7/K-52 south junction, from the K-7/K-52 north junction east to the US-69/K-52 south junction, and from the US-69/K-52 north junction east to the Kansas/Missouri state line, milling and overlay, 14.0 miles. (Federal Funds)
Montgomery: 166-63 KA-7157-01 – US-166, from the US-169/US-166 east junction east to the Montgomery/Labette County line, milling and overlay, 3.3 miles. (State Funds)
Wilson: 400-103 KA-7047-01 – US-400, from the US-400/K-47 junction east to the 2-lane/4-lane, ultra-thin bonded asphalt surfacing, 10.4 miles. (State Funds)
Woodson: 105-104 KA-5726-01 – K-105 bridge #021, located over Cedar Creek 1.34 miles southeast of US-54, bridge replacement. (Federal Funds)
Statewide: 106 KA-7184-01 – US-160, from the northeast wearing surface of bridge #023 north to the K-99/US-160 north junction; K-99, from the K-99/US-160 north junction to the Elk/Greenwood County line; K-99, from the Elk/Greenwood County line north to the K-99/US-400 west junction, crack repair, 18.6 miles. (State Funds)
District Five – South Central
Reno: 96-78 KA-7120-01 – K-96, from the K-14/K-96 junction east to the Reno/Sedgwick County line, pavement patching, 14.9 miles. (Federal Funds)
Reno: 14-78 KA-7128-01 – K-14, from the US-50/K-14 west junction to 3.9 miles east of the east city limits of Nickerson, pavement patching, 7.7 miles. (Federal Funds)
Sumner: 166-96 KA-6430-02 – US-166, from the US-166/US-81 junction east 9.07 miles to the transition from concrete to asphalt pavement just east of South Rock Road, guard fence, 9.1 miles. (State Funds)
District Six – Southwest
Clark: 160-13 KA-5757-01 – US-160 bridge #015, located over Bluff Creek Drainage 4.97 miles east of the US-183/US-160 junction; bridge #016, located over Bluff Creek Drainage 5.03 miles east of the US-183/US-160 junction, bridge replacement. (Federal Funds)
Clark: 160-13 KA-5751-01 – US-160 bridge #012, located over the Day Creek Drainage 1.85 miles west of the US-183/US-160 junction, bridge replacement. (Federal Funds)
Ford: 50-29 KA-7163-01 – US-50, from east Spearville east to the Ford/Edwards County line, milling and overlay, 7.6 miles. (Federal Funds)
Ness: 283-68 KA-6764-01 – US-283 bridge #049, located over the North Fork Walnut Creek 12.41 miles north of the Hodgeman County line, bridge repair. (State Funds)
Calvin Reed
Secretary
Department of Transportation
Doc. No. 051571