Volume 41 - Issue 48 - December 1, 2022
State of Kansas
Department of Transportation
Notice to Consulting Firms
The Kansas Department of Transportation (KDOT) is seeking a qualified consulting firm or team of firms to perform Independent Cost Estimating (ICE) professional services for the project described below. Interested consultants must email a proposal to desotoroadimprovements@ksdotike.org by 12:00 p.m. (CST) Thursday, January 5, 2023, to be considered for selection.
All firms doing business with KDOT must be registered and in good standing under the laws of the State of Kansas at the time of contracting and must comply with applicable state and federal laws, rules, and regulations.
Project Description
Table 1: Background and Scope of Project | |
---|---|
Project Number | Background and Scope of Project |
KA-6796-02 | The De Soto Local Roadway Improvements project will use the Progressive Design-Build (PDB) procurement method to select a progressive design-build team. The project is located generally along the existing footprint of 103rd Street between Evening Star Road and the Lexington Avenue/K-10 interchange. It also includes approximately one mile of the section on Main Avenue from 103rd Street south to the new Panasonic Energy Company electric vehicle battery manufacturing facility. The roadway is currently a two-lane asphalt roadway. The project will upgrade the roadway to approximately 4.5 miles of new, divided 4-lane roadway with curb and gutter, as well as sidewalks, on-street bike lanes, and a shared-use path. Additionally, three roundabouts are currently being evaluated at the Evening Star Road, Edgerton Road, and Main Avenue intersections. For additional information regarding this construction project, see the project website at https://desotoroadimprovements.ksdotike.org. |
General Project Delivery Method Description | PDB is an alternative delivery procurement method that uses a qualifications-based or best value selection to select a progressive design-builder. Following selection of a progressive design-builder, KDOT will work collaboratively with the progressive design-builder during the PDB Planning Phase and/or Pre-construction Phase to progressively advance and refine the project design and construction price using a cost model prepared by the progressive design-builder. The cost model will include:
|
Anticipated Consultant Scope
KDOT anticipates the following activities to be included in the ICE consultant’s scope:
- Participate in, maintain notes, and document action items and decisions made for team meetings as described in Table 2.
Table 2: Meetings | ||
---|---|---|
Meeting | Description | Setting and Estimated Frequency |
Planning Phase Kickoff Meeting | Initial kickoff meeting to develop a common understanding of purpose, assumptions, and outcomes for the project. | In-person meeting One occurrence |
Project Status Meeting | Project status meetings shall address general status of the work in detail, progress made, forthcoming work planned, and all issues with potential to cause delays or problems and their estimated effect on the project schedule. | Virtual meeting Weekly |
Risk Management and Project Schedule Meetings | Meetings focused on project schedule status and consolidating identified risks from other meetings and incorporating this information into the Risk Register. | Virtual meeting Every 2 weeks |
Executive Team Meetings | Leadership meeting to address status of the work and major risks with potential to cause delays or problems and their estimated effect on the project schedule. | In-person meeting Up to 6 occurrences |
Price Reconciliation Meetings | Meetings among the ICE, progressive design-builder, and KDOT to reconcile pricing in the OPCCs and Work Package GMPs. | In-person meeting Up to 6 occurrences |
As-requested meetings | ICE shall plan to attend up to two additional meetings per month to discuss project-related issues when requested by KDOT. | Virtual meeting Monthly |
- Develop a thorough understanding of the project and the project goals.
- Provide assistance to KDOT with respect to determining cost impacts of the following:
- Project phasing, labor availability, mobilization and site access, sequence of design and construction, and availability and procurement of equipment and materials.
- Identify methods and solutions for KDOT and progressive design-builder to consider that may facilitate execution of the work more efficiently (e.g., innovation, means and methods, equipment, material costs, and risk assignment).
- Prepare and maintain a resource loaded critical path method (CPM) project schedule for the overall Project and each work package to support development of an accurate estimate(s) of construction cost, confirm production considerations, and assess constructability issues related to the project.
- Provide input on risk management activities and status of items on the risk register, including identifying, assessing, mitigating, and allocating risks.
- Provide cost estimate support for the evaluation of proposed concepts using contractor style (production-based) methodologies and production-based heavy civil estimating software platforms, including:
- Prepare an overall estimate for the cost of work for the entire project in consideration of the progressive design-builder’s Work Packaging Plan.
- Prepare and submit an independent cost estimate at the Preliminary Design Submittal (approximately 30% design complete), to validate the progressive design-builder’s OPCC for each work package. Note that the project may be comprised of multiple work packages (up to six Work Packages should be assumed).
- Prepare and submit an independent cost estimate for each of the Work Package GMP (up to six work packages should be assumed).
- Conduct price reconciliation meetings with KDOT and the progressive design-builder to identify areas of substantive divergence (as identified by KDOT) between ICE and progressive design-builder’s OPCC and work package estimates.
- Reconcile substantive divergences for each of the identified items to bring the OPCC and Work Package GMP into the acceptable percentage range.
- Provide summary and detailed cost breakdowns.
- Share, review, and discuss assumptions, quantities, contingencies, and other items that affect the price of the project.
Qualifications
The ICE consultant must have construction, open-book pricing, and alternative project delivery experience. Key personnel for the project shall include the following: project manager, cost estimator, and scheduler.
Preference will be given to proposed key personnel with the following qualifications and experience:
Project Manager
- Ten or more years of experience in management and oversight of heavy civil construction projects and construction cost estimating with knowledge of construction and current market conditions.
- Strong presentation skills with experience leading meetings and discussions with multi-disciplinary teams on major infrastructure projects.
- Proficient in written communication with experience developing technical reports and memos related to independent cost estimating.
- Experience making decisions regarding risk management and other project issues that may affect pricing.
Cost Estimator
- Proficiency in production-based, heavy civil estimation software platforms.
- Experience performing contractor-style, production-based cost estimates for projects of similar scope, size, and complexity to the project.
- Reviewing project plans and specifications and offering ideas for innovation that align with the project goals.
- Ten or more years of recent and relevant estimating experience in heavy civil construction, specifically roadway, bridge, and underground utility construction, along with knowledge of construction means, methods, and equipment in these areas.
- Experience identifying, assessing, and pricing risk.
- Experience working for a construction contractor estimating and/or managing construction projects that are similar to the project.
Scheduler
- Experience developing resource loaded construction CPM schedules for projects of similar scope, size, and complexity to the project.
- The ability to review the progressive design-builder’s construction schedule and provide written analysis and recommendations to improve its usefulness to the project team.
- Ten or more years of recent and relevant scheduling experience in all trades of heavy civil and transportation, along with knowledge of construction means, methods, and equipment in these areas.
- Demonstrated proficiency in critical path scheduling (Primavera P6 or KDOT approved alternative) and analysis on at least three construction projects.
Instructions for Proposal
- No cost or pricing information shall be submitted with the proposal. Proposals including cost or pricing information will be considered non-responsive and withdrawn from further consideration.
- The consultant’s proposal must not exceed 14 pages total (excluding required forms and attachments). All pages shall be 8.5” x 11” in size. Font size shall not be less than 11 point, excluding the organization chart which must not be less than 10 point.
- A PDF of the proposal must be emailed to desotoroadimprovements@ksdotike.org by the proposal due date and time.
- The subject line of the email and the PDF file name must read:
- “KA-6796-02 – ICE_Services_[FIRM NAME]”
- The proposal must be accompanied by Special Attachments No. 8 (“Tax Clearance Certificate”) and No. 10 (“Policy Regarding Sexual Harassment”). If you need a Tax Clearance Certificate, you can request at https://www.ksrevenue.gov/taxclearance.html. Allow 2-3 business days for processing.
- The outline in Table 3 below describes the expected proposal organization and content sections.
- Table 4 lists the evaluation factors and associated weights which will be used to make a selection.
Table 3: Proposal Content | ||
---|---|---|
Section | Description of Intent | Max # of Pages |
Cover Letter | Cover letter conveying your interest in providing ICE services. | 14 Pages |
Delivery Method Understanding | Demonstrate your firm’s understanding of the PDB delivery method and how your firm will work with KDOT to ensure a successful project. | |
Project Approach | Provide an organizational chart to demonstrate reporting and communication among the proposed staff, including key personnel, that will provide the required services. Demonstrate anticipated communication between KDOT, the ICE, and the Progressive Design-Builder within the organizational chart. Describe your approach to accomplish the services described in the anticipated consultant scope in an efficient manner and to a high standard. Include cost-effective and optimized solutions to address the Project. Include qualifications or experience related to the Project approach. | |
Firm Qualifications and Experience | Describe the firm’s past experiences with respect to ability to create accurate, high quality project schedules and independent cost estimates. Include three client references and reference contact information (phone and email). | |
Project Staff Qualifications and Experience | Identify the key personnel for this project (project manager, cost estimator, and scheduler) and provide a resume for each detailing their experience with regard to their position on the team. Resumes shall not exceed two pages for each key personnel position. Include names, office location, qualifications, education, training, expertise, and other relevant information. Include three references and reference contact information (phone and email) for each of the key personnel. |
Table 4: Evaluation Factors | |
---|---|
Evaluation Factor | Weight |
Delivery Method Understanding | 10% |
Project Approach | 20% |
Firm Qualifications and Experience | 25% |
Project Staff Qualifications and Experience | 25% |
Interview | 20% |
Interviews
- Virtual Interviews will be held with each firm via Microsoft Teams.
- Interviews will be scheduled for 45 minutes.
- All key personnel are required to attend the interviews.
The purpose of the interview is to allow proposers to present their analysis of the project, to allow the selection panel time to clarify the consultant’s qualifications in a question-and-answer session, and to allow the Department to assess the consultant’s understanding of the services and the PDB delivery method.
Contract Terms and Conditions
- A standard KDOT agreement for technical services will be used for the project. The form of the agreement or a link to the form of agreement will be posted to the project website at https://desotoroadimprovements.ksdotike.org.
- The following special attachments will need to be provided by the selected consultant and all subconsultants with the signed work order following negotiations and will become attachments to the contract:
- Special Attachment No. 8 (“Tax Clearance Certificate”)
- Special Attachment No. 10 (“Policy Regarding Sexual Harassment”)
- Proposers must complete a Conflict of Interest Disclosure Form and include the completed form in their proposal which discloses any relationships that create, or appear to create, a conflict of interest with the work that is contemplated in this Request for Proposals (RFP). Members of KDOT’s project management team (Garver and Burns & McDonnell) and members of firms that are on a progressive design-build respondent team for the De Soto Local Roadway Improvements Project (KA-6796-03) may not participate on the ICE consultant’s team. The Conflict of Interest Disclosure Form or a link to the form will be posted to the project website at https://desotoroadimprovements.ksdotike.org.
- This RFP does not obligate KDOT to award a contract or complete the project and KDOT reserves the right to cancel the RFP if it is in its best interest. KDOT also reserves the right to accept or reject any or all proposals submitted in response to this solicitation.
- Any proposal received after the due date specified above will be considered late and will be rejected.
- Once the selection to this solicitation is announced, proposers may request a formal debrief from KDOT with regard to its selection.
- Proposals and their content will become the property of KDOT. All proposals will be treated as non-public records until the Contract has been executed by all parties.
Anticipated Schedule and Key Dates
- Proposals are due by or before 12:00 p.m. (CST) Thursday, January 5, 2023.
- The program fiscal year for this project is FY 2023 (July 2022 – June 2023).
- Virtual Interviews are anticipated to occur January 18 through January 20, 2023.
- Anticipated ranking of proposals to occur the week of January 23, 2023.
- Negotiations with the most highly ranked firm are expected to begin on or around Monday, January 30, 2023.
- Anticipated execution of the ICE contract – February 2023.
- Other important dates:
- Anticipated execution of PDB contract with progressive design-builder: January 2023.
- Early work packages authorization: as early as 2nd Quarter of 2023.
- All Work Package GMPs authorized: 4th Quarter of 2023.
- Substantial completion: June 2024.
Questions
- All questions regarding this RFP shall be emailed to: desotoroadimprovements@ksdotike.org.
- Questions can be submitted until 5:00 p.m. (CST) Wednesday, December 21, 2022.
- Responses or a link to responses will be posted on or before Friday, December 30, 2022, to the project website at https://desotoroadimprovements.ksdotike.org.
Questions can be submitted until May 20, 2022; answers will be provided to all prequalified consultants on May 25, 2022.
Marcia Turner, P.E., Contracts Manager
Division of Engineering and Design
Doc. No. 050708