Notice to Consulting Firms

The Kansas Department of Transportation (KDOT) is seeking a qualified consulting firm or team of firms to perform professional services for the project(s) described in Table 1 below. Interested consultants must email a proposal to KDOT.DesignContracts@ks.gov by 12:00 p.m. (CST) February 11, 2022, to be considered for selection.

Consultant Prequalification

Interested consulting firms must be prequalified by KDOT or otherwise demonstrate qualification in Category 241 Construction Inspection and Testing.

If a firm is not currently prequalified by KDOT, a proposal may still be submitted. Firms not prequalified must also provide documentation that demonstrates the firm is qualified for each specified category listed in this notice for the project. Firms may use the KDOT prequalification form to provide this documentation. KDOT 1050 Prequalification category definitions (Blue Book) can be found at http://www.ksdot.org/descons.asp. All firms doing business with KDOT must be registered and in good standing under the laws of the State of Kansas at the time of contracting and must comply with applicable state and federal laws, rules, and regulations.

Table 1: Background and Scope of Project
Project Number Background and Scope of Project
KA-5175-01 Staff required: Project manager and inspectors as necessary to inspect grading, HMA plant, subgrade/base HMA roadway, seeding, erosion control, traffic control, CMS or AASHTOWare data entry, all project records, all project paperwork, and final paperwork, etc.

Table 2: Project Summary
Project Number Route and Scope Project Termini
KA-5175-01 U050-029
Construct left turn lanes on US-50 at the intersections of Clark and Main Street Spearville:
US-50 at Clark Street and US-50 at Main Street

Anticipated Consultant Scope

KDOT anticipates the following to be included in the consultant’s scope: Construction Inspection/Testing.

Note: This effort will be managed out of KDOT office in Dodge City, Kansas.

Anticipated Schedule and Key Dates

  1. Proposals are due by or before 12:00 p.m. (CST) February 11, 2022
  2. Anticipated Start Date: June 2022
  3. Estimated Working Days: 90

Instructions for Proposal

  1. No cost or pricing information shall be submitted with the proposal. Proposals including cost or pricing information will be considered non-responsive and withdrawn from further consideration.
  2. The consultant’s proposal must not exceed 4 pages total (including any cover letter, index, etc.)
  3. A PDF (2MB maximum size) of the proposal must be emailed to KDOT.DesignContracts@ks.gov by the proposal due date and time.
  4. The subject line of the email and the PDF file name must read:
    1. “RFP for KA-5175-01–ConstInsp on US-50 LT Lane Addtn in Ford Co.r1_FIRM NAME”
  5. The proposal must be accompanied by Special Attachments No. 8 (“Tax Clearance Certificate”) and No. 10 (“Policy Regarding Sexual Harassment”). If you need a Tax Clearance Certificate, you can request one at https://www.ksrevenue.gov/taxclearance.html. Allow 2-3 business days for processing.
  6. The outline in Table 3 below describes the expected proposal organization and content sections.
  7. Table 4 lists the evaluation criteria and associated weights which will be used to make a selection.

Table 3: Proposal Content
Section Description of Intent
Cover Letter (no more than 1 page)
Project Approach Describe how your firm will meet the fluctuating inspection needs of the project.
Approach to Quality Control Describe methods or procedures your firm will use to provide all services with professional quality and technical accuracy.
Qualifications and Experience For key personnel to be assigned to the project provide names, qualifications, education, training, and expertise. Identify their area(s) of responsibility and percent of their time dedicated to the project. List work for which you do not have in-house capability and name the firm you propose to subcontract with.
Past Performance Describe team’s past performance with respect to ability to meet project schedules; quality of work; and ability to control costs on similar transportation projects, especially those performed for KDOT. Include three references and contact information.
Familiarity with KDOT and Project Area Describe team’s familiarity with KDOT’s inspection processes and standards. Describe familiarity with the project area and any identified special site conditions.

Table 4: Evaluation Factors
Evaluation Factor Weight
The quality and completeness of the response 10%
Availability to respond to the work 20%
Qualifications and experience of Project Manager and other key project team members proposed for services 20%
Past performance history for similar projects/services for KDOT 20%
Understanding of the project area 10%
Understanding of KDOT contract administration and closeout procedures 20%

Contract Terms and Conditions

A standard KDOT agreement for engineering and technical services will be used for professional services projects. The following special attachments will need to be provided by the selected consultant and all subconsultants with the signed work order following negotiations and will become attachments to the contract.

  • Special Attachment No. 8 (“Tax Clearance Certificate”)
  • Special Attachment No. 10 (“Policy Regarding Sexual Harassment”)

Questions

All questions regarding this request for proposals shall be emailed to KDOT.DesignContracts@ks.gov.

Questions can be submitted until February 4, 2022; answers will be provided to all prequalified consultants on February 7, 2022.

Marcia Turner, P.E., Contracts Manager
Division of Engineering and Design

Doc. No. 049777